Railway Budget Hits and Misses

The railway budget for the year 2011-12 is expected to boost infrastructure in various areas, particularly tourism. But there are many areas that the Union Minister for Railways has let unattended

Barricading Noise

The first technologically advanced acoustic barriers are being installed along Bandra-Kurla Link Road (BKLR), Mumbai by the “Fracasso” Group. The Group, a leading manufacturer of noise barriers and W beam crash barriers, is now in the process of introducing crash tested barriers and corrugated steel culverts in India.

Mumbai Metro-Connecting safely and efficiently

Mumbai Metro, Mumbai’s first Mass Rapid Transit System, will cross Andheri’s JOG flyover on Western Express Highway at a height of 22m by a Cable Stayed Bridge for its first line – the VAG corridor. Extended Pier caps have been designed to avoid Piers at the centre of any traffic junction to allow larger spans – a first in the world for Metro Projects. 16 trains will be put in service with a four coach unit carrying 1500 passengers, reducing the travel time from 90 to 21 minutes.

Now, Green Buses

In order to provide an eco-friendly, comfortable and clean mode of public transport to the residents of Mumbai, and to reduce traffic congestion on roads, […]