The Oval Maidan-Churchgate-Virar elevated corridor on the Mumbai suburban rail section will be built using a standard gauge track with a width of four feet and eight-and-a-quarter inches, as opposed to the normal five feet and six inches wide track for broad gauge trains used in India. This will make the train coaches on the elevated corridor 3.22 metres wide ...