By when will all the seven phases of Metro be operational? The MMRDA has already started the elevated corridors because they are relatively easier to complete. They are planning to commission them by 2019 itself – at least the first two phases – 2A and 7A. And the rest would follow. Phase 1 of Line 3, i.e., Depot to BKC will ...
Tag Archives: Mumbai suburban railways
E-chip for Mumbai trains
The Central Railway has installed on a trial basis a new electronic chip in two of its retrofitted trains. The chip is fixed in the motor cabs of the trains – the cabs that contain the electrical equipment in an Electric Multiple Unit (EMU). The signals sent by the chip will help railway engineers, sitting in the control room, to ...