The first metro tunnel between two stations on the Chennai Metro has been completed. The 1.3km long tunnel has been constructed in five and a half months. The tunnel goes under 750 buildings and is a part of the underground corridor of the Chennai Metro. About 958 rings, which act as the roof and the walls, have been fixed along ...