Facebook  Twitter  Linkedin  YouTube
Friday , 19 April 2024

Tag Archives: Hybrid Annuity

Vadape -Thane Hybrid Annuity Project

MEP Infrastructure Developers Ltd had received ‘the letter of appointed date’ from NHAI for the eight-laning of existing four-lane Vadape to Thane from 539.202km to 563.000km section of NH-3 (new NH-848) in Maharashtra to be executed on Hybrid Annuity Mode. It is a welldesigned four lane divided corridor carrying heavy traffic. The total length of the stretch is 23.227km. The ...