Page 31 - TT mag Sept 2025 Digital Edition
P. 31

ITS









                                                     Project Controls serve as
                                                     the backbone to ensure the
                AI are used in data integration to   project’s success through
                provide real traffic data. Bright    effective management. These
                traffic lights can use real-time
                data to coordinate timing and        are not instruments, but are
                automatically cut delays by up       strategies to ensure cities are
                to a fifth.                          bright and habitable.”
                  Coordinating between
                stakeholders can streamline          — Bhavin Lakhani
                governments, contractors, and
                communities by giving regular
                updates to reduce conflicts by 30%.
                Including technology like 5G to
                facilitate smooth communications
                assists in the timely and cost-
                effective delivery.

                Bengaluru Adaptive Traffic        traffic data collection by IoT      performed weekly, identifying
                Control System Case Study         sensors and programmed signal       problems early and preventing
                                                  patterns to change dynamically.     15 percent of potential cost
                  Motor parking is a nightmare    D-CAC coordinated with the city     overruns
                every day in Bengaluru, India. As   authorities and met daily to discuss
                a tech hub, the city experiences a   the progress.                 •  Make new teams. Productivity
                vehicle population of more than                                       can increase by 20% using
                eight million vehicles operating   The result? Travel time was        software such as MS Project
                on its streets. To solve this, the   reduced by 15-20% in the central   •  Communities are on the same
                Bengaluru Adaptive Traffic Control   regions, the load in congestion   page and the number of
                System (BATCS) was implemented    areas decreased by 10%, and         disputes reduces by 30 percent
                                                  fuel consumption declined by
                in 2021. The project is an AI-driven   5%. There was also a 12 per   •  Adopt high technology. This
                program that controls 165         cent improvement in emergency       helps improve data transmission
                intersections with real-time adaptive   response time. This case      and reach heights of
                signals.
                                                  demonstrates how project controls   responsiveness of 40%
                  It was developed in collaboration   can deliver measurable results in   •  Risk plan. Excessive potential
                with the Centre for Development   complex, innovative traffic projects.  delays such as regulatory hold-
                of Advanced Computing (C-DAC),                                        ups, should be anticipated and
                and it is an IoT-based and AI     Recommendations                     contingencies implemented
                tool to optimize traffic speed. Its
                success was focused on project    •  Use real-time data. Install IoT   •  Measure sustainability. Periodic
                controls. The specific planning was   sensors to track traffic flow, its   safety inspections during
                conducted in detail to decrease     speed, and density. Processing    construction reduce accidents
                travel time by 20%. The project     this information will alleviate   by approximately 10 percent
                was a highly tight budget of Rs 150   congestion by up to 25%      •  Finally, implement real-time
                crore.                            •  Secure the tangibility of goals.   dashboards. Monitor carbon
                                                    Have quantitative targets, e.g.,   footprints to stay within the
                  The auditing was conducted
                weekly to ensure transparency.      a 10 per cent decrease in travel   environmental objective
                There was also risk management      time or a five per cent reduction   However, the delivery of these
                in case of delays due to roadwork   in emissions                   projects is fraught with problems
                plans, which were implemented     •  Conduct routine audits. Budget   —budget overruns, delays, and
                in phases by zone. AI analysed      and schedule reviews are       coordination issues.

                                                                        www.trafficinfratech.com • TrafficInfraTech • SEPTEMBER 2025 31
   26   27   28   29   30   31   32   33   34   35   36