Page 49 - TrafficInfraTech Magazine | Linking People Places Progress
P. 49

INFRASTRUCTURE







                     Commissioner  has  been  inspired  by   and standards of roads redevelopment   water, sewer, storm water, power
                     Tender SURE to produce guidelines   across the city. Tender  SURE is also   and telecom.
                     for Pune. Nagpur in Maharashtra has   putting on notice all consultants and   3.  50 Intersections redesigned to
                     recently allocated Rs 700 crores for   contractors, forcing them all to improve   allow for efficient movement,
                     Tender SURE roads. In Hubli – Dharwad   the standard of design and delivery.   adequate  turning  radii  and safe
                     in north Karnataka, Tender SURE roads   Design consultants and architects   pedestrian crossings
                     have been designed by Jana USP and   are now eagerly climbing on to the   4.  30km of pedestrian friendly paths
                     are currently under construction.   Tender SURE roads redevelopment   added in the CBD, an area with
                                                      bandwagon.
                     Improvements experienced                                             many schools – 300 % rise in
                     by Bangalore City                 In addition, there is now an       pedestrians
                                                      acceptance across the senior levels
                      Based on the success of the pilot   of service providers, on the need for   5.  400 designed spaces for organized
                     roads, the government of Karnataka   taking cables underground. The focus   on street parking for cars, two
                     has allocated over 1000 crores   is also on the financial recovery of   wheelers, cycles, autos.
                     towards  Tender  SURE  roads.  The   capital expenditure through annuity   6.  10 bus bays added, improving
                     interesting collateral benefit has been   charges from telecom services, etc.  traffic and access to public
                     the upgradation of engineering and   Some of the immediately measurable   transport
                     design of non-Tender SURE road-works                              7.  10 kms of cycle paths
                     in different parts of Bengaluru city.   differences due to the completed   8.  300 Trees preserved and contained
                     Engineers and contractors have begun   roads are:                    against vehicular accidents
                     to utilise different components of Tender   1.  15 kms of well-designed Tender
                     SURE specifications in their projects.   SURE  roads in  Bangalore,   9.  10 kms of Landscape strips added
                     Many engineers are embracing the    improving traffic movement, and   10. 1000 new street lights improving
                     specifications of pavers, of bollards, of   revitalizing the CBD.    safety, with energy saving
                     kerbstones, street lights etc. Regardless   2.  Seven utility networks scientifically   technology
                     of this piecemeal execution of Tender   laid within the footpath on either   11.   Four landmark  areas designed
                     SURE components, it is nevertheless   side of the road, with regular   providing  2500sqmt  of  public
                     improving the engineering capacity   access chambers for maintenance:   space































                          St. Marks Road: After Tender SURE






              www.trafficinfratech-com-500653.hostingersite.com                                                              June-July ’18 / TrafficInfraTech  49
   44   45   46   47   48   49   50   51   52   53   54