INFRASTRUCTURE







                  engineers and planners, Tender SURE   BBMP  would be  the nodal agency   and sewage. BESCOM in charge of
                  is the first set of such guidelines for   to actually float the Tender SURE   power lines, KPTCL in charge of major
                  urban roads in India published in two   contract and award the work. This   power transmission. The Traffic police
                  bound volumes. Volume 1 defines   also meant that BBMP would need to   in  charge  of traffic and  surveillance
                  design guidelines and Volume 2   actively engage with all the other civic   infrastructure. The telecom has BSNL
                  provides procurement and execution   agencies in order to ensure that the   (central government), and many
                  guidelines. Volume 2 was initiated at   integrated, holistic approach needed   private players regulated by the BBMP.
                  the behest of the Chief Secretary of   for Tender SURE to succeed was not   Each one of these agencies builds
                  that time, who said, “Currently we end   lost.                    its infrastructure in silo, through its
                  up spending money on the same roads   Now,  the  government   is  own individual contractors, without
                  many times. This is very inefficient.   implementing over 50km of Tender   knowledge or consideration to the
                  Tender SURE is a fantastic concept   SURE roads.                  networks of other agencies. Every
                  and will improve the quality and                                  time there is a problem, the road is
                  long-term RoI.” Contract guidelines   The technology details of   dug up and costs are incurred. In such
                  were important to address the issue   the project                 a broken system, what we see as users
                  of “leaks” in road works contracts, as   Tender SURE breaks once, and fixes   of the roads is nothing but chaos: badly
                  well as provide quality measurement   once-and-for-all 3344       designed roads, poorly constructed
                  and maintenance criteria. Members   A city road is not just the road, but a   underground systems, and repeated
                  of Bangalore City Connect saw merit   carrier of multiple other utilities. They   cut-relaying-cut expenses.
                  in the idea of Tender SURE too, and   are the “super seven” - power, water,   Solving this was the core idea
                  supported it whole heartedly.    sewage, drainage, telecom (many),   behind Tender SURE: fix both the road,
                   In 2012, the Government of      gas (new) and security surveillance &   and also what under the road with an
                  Karnataka  approved  and  sanctioned   traffic management.        integrated road design, and we fix the
                  funds for the first set of model   Unfortunately, in Bangalore (and   problem. Instead of spending seven
                  TENDER SURE roads to be taken up   most  cities),  these  multiple  services   times cutting up the same road for
                  for Bangalore, at a cost of Rs.200Cr.   are run by different civic agencies. The   each service, Tender SURE ensures
                  Even though there were multiple civic   BBMP is in charge of the road works.   integration, and a one-time spend,
                  bodies involved, it was logical that   The BWSSB is in charge of the water   thereby saving three times the cost
                                                                                    over a ten-year timeframe.
                                                                                      For the first time in urban India, this
                                                                                    level of detailed design and technical
                                                                                    drawings have been produced for
                                                                                    city roads. Over 2000 construction
                                                                                    drawings went into the first set of
                                                                                    roads – detailing every single line
                                                                                    and square foot of the roads and
                                                                                    intersections and any subsequent
                                                                                    revisions due to ground conditions or
                                                                                    agency changes. This level of detail is
                                                                                    possible only after multiple iterations
                                                                                    with each individual agency involved,
                                                                                    and complete internalization of the
                                                                                    challenges on the ground, and the
                                                                                    technical solutions to these challenges.
                                                                                    What have been the
                                                                                    challenges?
                                                                   Church Street      The execution of the Tender SURE
                                                                                    project was filled with complex
                                                                                    challenges from day one. Many of