                    Sometimes, some members of      Despite many hindrances,      with astonishing rapidity, and no
                  a party will refuse to pay toll, and   Ashoka Buildcon has set records   compromise on quality and safety.
                  incite those using the road to do   for project completion. We    In the last few years, the rate of
                  the same. Not only does this affect   had 30 months to construct   growth of the highway sector has
                  operations and maintenance      the Rupnarayan  bridge near     slowed down. If we addresse the
                  of the road, it also causes huge   Kharagpur; we finished it in 10   above problems and implement
                  losses to the government.       months. We reduced a two-year   solutions for the same, we will
                  Unmanned toll plazas are a      execution timeline to just 38 days.   surely be able to connect India by
                  futuristic but effective solution to   A flyover on Delhi’s Outer Ring   building many more kilometres of
                  ensure uniform collection of toll.   Road was completed in 100 days,   highways every day.



                 The need to find a win- win approach




                            omplimenting  Ashoka    pressure of targets, the Contractors/   “Be it Hybrid Annuity or EPC mode,
                            Buildcon for being one   Concessionaires also happily agree   our concern is not just the availability
                            of the best performing   to accept the Appointed Dates by   of 80 or 90% land, but it is also the
                            entities in the Highway   giving waivers to the fulfillment of   availability of contiguous land. The
                 Cconstruction sector,              pre-conditions. When I first  came   contiguity  of  the  work front  is  as
                 Yudhvir Singh Malik, Secretary,    to NHAI, I had withheld more than   critical as availability of 90% land.
                 MoRTH agreed that land acquisition   25 cases of declaration of appointed   If 90% of the land is available with
                 and utility shifting remain the major   dates because of these issues   50 gaps in it, the project would face
                 challenges. “As an institutional   but surprisingly the Construction   problems in smooth execution. The
                 arrangement, now we are considering   agencies were more keen to accept   response of the Industry to address
                 a system wherein the Contractors are   pre-mature declaration of appointed   such situations varies widely. While
                 allowed to commence work on pre-   dtaes. I was given to understand   one entity may choose to take the
                 construction activities like tree-felling   that they were eagre to do so as   route of arbitral claims on account
                 and utility shifting during the period   they wanted to get the mobilisation   of delays, a performing entity,
                 intervening between the issue of   advance.                          that targets the bonus, adopts an
                 Letter of Award and the declaration   “It is my personal view that it would   innovative approach of taking the
                 of Appointed Date. Particularly, if it is   be a good idea to have one year as
                 a project awarded under the Hybrid   an Award holiday, which should be   missing links from the land owners on
                 Annuity Mode, the Contractor/      utilised to complete all pre-project   lease. Thus, it depends on what kind
                 Concessionaire gets about six months   activities like Land Acquisition,   of approach a particular construction
                 time for achieving the financial closure   approval of Utility shifting estimates   entity is adopting. While we are trying
                 and this intervening period can be   and tree-felling etc. so that the   to tighten the norms on our side with
                 gainfully utilised for completion of   project execution period is optimised.   regard to availability of land before
                 these pre-construction activities. This   It is an unhappy situation that that   we invite bids or before we give the
                 intervening period does not count   the Construction agencies are as   appointed dates, the construction
                 towards the scheduled completion   much willing to give the waivers in   industry should start insisting on the
                 period of the project”.            fulfillment of the preconditions as the   completion of the pre-conditions
                   Mr  Malik continued and  said,   Ministry is found wanting. I would,   and refuse to give the waivers on
                 “Secondly, there is no denying the   therefore, suggest that the industry   that account. As a matter of fact,
                 fact that on our part, we have been   must take a stand that if we are   the joint statement signed between
                 found wanting in terms of provision of   not meeting the pre-conditions for   the parties before declaration of the
                 100% project land. While the project   declaration of an appointed date,   Appointed Date is going to be made
                 execution agencies occasionally    it should not accept the appointed   a part of the Contract Agreement so
                 resort to pre-mature declaration of   date as the ineherent inefficiencies   that neither party back-tracks from
                 appointed dates driven under the   hit both sides adversely.         the same at a later stage.