                As we look at it, if I have a two-lane   Highway. They will have to provide for   per the control of weights and measures
              road with paved shoulder without a   that feature before we allow an access.   because if we do not keep that kind of
              divided carriageway, it carries traffic up   That is perhaps one way to put a control   a sanctity of a weigh in motion bridge
              to even 20,000 PCUs a day but ideally it   on the emergence of larger number of   measurement, then it is a challenge to
              should not be carrying a traffic of about   black spots in future as we go along.  the technology.
              15,000 PCUs. The moment we make        However, analysis shows that the    Will having an integrated road plan
              it a divided carriageway, immediately   accident is largely in terms of two   involving States and Central government
              the capacity goes to 40,000 PCUs and   wheelers, it is largely the over-speeding   will be more effective?
              if you make it an access controlled   and unabated speeds with which people
              divided carriageway of four lanes, the   go. In case of light motor vehicles, it   While it makes a lot of sense to have an
              carrying capacity goes to 80,000 PCUs.   is again over-speeding, going beyond   integrated plan, I think the states have to
              That is how it makes the difference and   the controllable systems. In case of the   get into that mould of taking their own
              increasingly the Ministry also has to take   heavier vehicles, particularly the freight   responsibilities. What has happened is
              recourse to building of new National   vehicles, my own assessment is that the   not withstanding the transfer of 42%
              Highways keeping in view these kinds of   accidents are caused not because the   of the divisible resources as per the last
              growth parameters as they come along   driver is not trained, not because the   finance commission recommendations,
              and also planning for a perspective of   driver is unruly, because of fatigue and   every state is trying to get more and
              about 30 to 40 years. But we need to   sleep while on the driving seat.  more of the state roads declared as
              look at the road accident data in the                                    National Highways. So, there has to be
              country as a matter of serious concern.   Ultimately, it depends on a    a very clear benchmarking on what is
              We need to assess accidents taking   combination of technology as well as   supposed to be a national highway and
              place due to road engineering defects   maturity of the road users’ compliance   what is supposed to be a state road.
              or due to other reasons.             to the rules of the road which are going   It is important that we work on the
                                                   to play a definitive role in containing this   NH with the corridor approach. They
                More than the road engineering
              defect, what really creates problems   disturbing trend of the accidents and   pass through multiple states; these
              is the subsequent joining of arterial   fatalities as they occur. I am sure that   are economic corridors or passenger
              road creating a black spot. There is  a   the temptation to go in for overloading   corridors and these are passing through
              requirement of creating interchanges   of heavy vehicles would get contained   the state capitals. The second part
              whereby traffic can be regulated. We   as increasingly the roads are going to be   what we have found is, all these years,
              are revisiting our access guidelines and   equipped with more and more weigh in   you rarely find a road which is a crow
              putting some kind of a caveat that as   motion devices and I would only request   flight road because the road has been
              on the date of completion of a national   the Industry to implement that.    constructed to  connect destinations.
              highway  it  is  our  responsibility  to   Even in terms of Ministry’s own   So, if it is a 1000km road, it must
              address all such inter-connectivities and   regulations, when we have increased   pass through connecting 20 major
              the interchanges. But anything coming   the loads limits, the permissible band   destinations and it takes its curves
              up subsequent to the completion of it   is within 5%. The Industry also has to   and shapes as it has to connect those
              before, it will have to be at the cost of   look at what intervals equipment would   en-route destinations. So, the thinking
              whosoever is seeking that access to the   require calibration and re-calibration as   is on, the plan is on


























        56  October-November ’18 / TrafficInfraTech                                                        www.trafficinfratech-com-500653.hostingersite.com
   51   52   53   54   55   56   57   58   59   60   61