Page 40 - TT Aug-Sept pdf for digital
P. 40

INFRASTRUCTURE




         Bridge Health Monitoring




         Engineering triumph in the Udhampur-Srinagar
         -Baramulla Rail Link (USBRL) Project


          The USBRL project is a landmark initiative aimed at connecting the
          Kashmir Valley with the rest of India through a reliable rail network.
          Within this extensive project, two bridges – Bridge No. 39 over Sulla Khad
          Nalla and Bridge No. 43 adjacent to the Chenab Bridge – stand out as
          engineering marvels. These bridges are equipped with state-of-the-art
          structural health monitoring systems implemented by PMT Infrascience
          Pvt. Ltd., ensuring their safety, longevity, and performance.





































          Bridge No. 39:                   7,000 metric tons of reinforcement   meters and accommodates the
          An Engineering Feat              steel, and 7,552 metric tons of   Salal station yard. Like Bridge
                                           structural steel. The height of its   No. 39, it features continuous
           Bridge    No.    39    spans    piers ranges from 35.08 meters to   composite steel girders, with
          approximately 490 meters with    90.53 meters, with Pier P5 being   490 meters of the bridge being
          a span arrangement of 1x53.15    the tallest. Stress was encountered
          + 6x64.0 + 1x53.15 meters,       in this region.                  straight and 287 meters curved.
          supporting  a  double-line  Reasi                                 The  construction  of this  bridge
          station yard. The bridge features   Bridge No. 43:                required 4 lakh cubic meters of
          continuous composite steel girders,   Structural Ingenuity        earthwork, 36,948 cubic meters
          and its construction involved                                     of concrete, 5,862 metric tons of
          massive efforts, including 7.5    Bridge  No.  43  extends  777   reinforcement steel, and 7,920
          lakh cubic meters of earthwork,   meters with a span arrangement   metric tons of structural steel. A
          36,500 cubic meters of concrete,   of 1x35 + 1x53 + 10x64 + 1x49   notable aspect is its unique hybrid


     40   TRAFFICINFRATECH / August-September 2024 / www.trafficinfratech.com
   35   36   37   38   39   40   41   42   43   44   45