Page 23 - TT Mag Feb 2024 Digital Edition_New
P. 23

ON THE COVER





                                                                                   Authority, said that the total length
                                                                                   of Noida-Greater Noida Expressway
                                                                                   is 24 km, of which 21km is in Noida
                                                                                   and three kilometers in Greater
                                                                                   Noida. The expressway goes from
                                                                                   Mahamaya Flyover Noida to Pari
                                                                                   Chowk Greater Noida. One can
                                                                                   reach Greater Noida via Noida-
                                                                                   Greater Noida Expressway and
                                                                                   further via Yamuna Express to
                                                                                   Agra and from Agra to Lucknow via
                                                                                   Lucknow Express without stopping.

                                                                                     There are five small and five big
                                                                                   underpasses. Equipped with LED
                                                                                   lights, the expressway has a width
                                                                                   of 150 meters with green belt on
                                                                                   either side.
                changes but also contributes      not only enhanced security but
                to environmental benefits  by     also contributed to the overall    “Direction sign boards have
                minimizing carbon emissions due   safety  perception  of  the  stretch,   been installed at identified places
                to smoother driving patterns.     said “Rajat Mishra, Chief Executive   and emergency boards at accident
                                                  Officer (CEO) and Director, EFKON   prone areas. The Noida Authority
                  The innovative approach         India Pvt. Ltd.                  has made available Police
                of installing GPS chips within                                     assistance, emergency number
                batteries and solar panels, along   EFKON tackled challenges such as   boards, cranes and other features
                with surveillance in theft-prone   power fluctuations and optical fiber   needed for safe movement of
                areas,  successfully  eliminated   cuts due to ongoing construction   vehicle,” added Dr. Lokesh.
                thefts and consequently reduced   activities with globally acclaimed   Under the ISTMS projects, 177
                cases of roadside mugging. This   design solutions. This ensured   cameras,  60km  fiber  and  eight
                                                  the uninterrupted functioning of
                                                  the traffic management system,   variable message boards have
                                                  critical for maintaining traffic flow   been installed by Noida Authority
                                                  and safety.                      for traffic management. In case of
                                                                                   accident/disaster, Emergency Call
                                                   Talking about the project       Booth (ECB) help in quick access
                                                  Dr Lokesh M, IAS, CEO, Noida     to central control room. Data from
                                                                                   the Speed monitoring cameras is
                                                                                   also received and analysed in the
                                                                                   Control Centre.

                                                                                     “To facilitate enhanced traffic
                                                                                   management service by the police
                                                                                   department, we are in the process
                                                                                   of installing 108 cameras, 13 public
                                                                                   announcement systems and four
                                                                                   variable message boards. This work
                                                                                   will be completed by March 2024.”
                                                                                     Road safety measures include
                                                                                   crash barriers, ambulance and
                                                                                   creation of dust free zones with
                                                                                   dense plantation.


                                                                            www.trafficinfratech.com / February 2024 / TrafficInfraTech  23
   18   19   20   21   22   23   24   25   26   27   28