Page 27 - TT Mag Feb 2024 Digital Edition_New
P. 27

ON THE COVER





           implemented through Pubic Private          Traffic Information and Management System (TIMS):
           Partnership (PPP) model. A service
           provider has been appointed to   S.No.  Sub-system                                  Quantity
           carry out parking management     1.     Chennai Traffic Information & Management –   1 location
           at the identified parking spaces.       Command and Control Centre
           Further, a city level parking policy   2.  Adaptive Traffic Signal Control System   165 junctions
           is being prepared for Chennai to   3.   Traffic Incident Detection System (TIDS)    58 locations
           address all parking related issues.
                                            4.     Variable Message Sign System (VMS)          17 locations
           What do you feel are the         5.     Speed Limit Violation System (SLVD)         10 locations
           main challenges Chennai          6.     Red Light Violation Detection (RLVD)        50 junctions
           is experiencing while            7.     Automatic Traffic Counters-cum-classifier (ATCC) System  115 locations
           implementing ITS?
                                            8.     Integrated Traffic Management System (ITMS) with   1 set
            The major challenges during            probe system Platform and with required integrations
           the implementation of the project
           are construction of metro rail
           across the city and other large
           infrastructure projects in the city.                      City Bus system (CBS):
           The  major  construction  activities   S.No.  Sub-system                            Quantity
           have resulted either in closure of   1  MTC Command and Control Centre              1 location
           a particular section of the road or
           detouring of traffic. To overcome   2   Bus Monitoring System / Automatic Vehicle Location   3500 Buses
           any such challenges, the phasing        (CAD/AVL) system
           of the ITS project is designed in line   3  Passenger Information System            71 Terminals & 532
           with those construction activities.                                                 Bus shelters
                                            4      Depot Management System                     31 Depots
           What is Chennai doing to
           achieve gender equality
           in Mobility?                    initiative is to provide women with   and transport services. It will also
                                           safe, comfortable and accessible   improve the perceptions of safety,
            To ensure inclusivity and
           gender equality, Greater Chennai   public spaces. One of the pillars of   and enable gender inclusivity in
           Corporation has formed a first   the Gender and Policy lab is the   the city while applying gender
           of its kind “Gender and Policy   emphasis on providing key inputs to   lens on infrastructure design and
           Lab”. The broad objective of this   enhance the existing infrastructure   public transport services.





























                                                                            www.trafficinfratech.com / February 2024 / TrafficInfraTech  27
   22   23   24   25   26   27   28   29   30   31   32