ITS








                          about how technology is going   Limited (JCTSL) had signed an   the system has been reworked
                          to help achieve that mobility plan   agreement with UTI Infrastructure   and a Comprehensive Traffic and
                          and safety requirements and, ITS   and Technology Services Limited   Transport Study (CTT) was carried
                          systems should be designed and   (UTIITSL) to provide Intelligent   out by the Jaipur Development
                          deployed based on that plan.    Transport Management Systems   Authority to formulate a long-term
                          Internationally, this step is often   for common mobility cards in   transport strategy for Jaipur region
                          captured in a Concept of Operations   Jaipur. Initially, the project was   and identify a practical and effective
                          document. Moreover, there should   to  introduce  an entire  system   investment plan for 20 years. The
                          be a structured approach to how ITS   including AFC, a vehicle tracking   study addresses immediate and
                          systems are designed, configured   system, management information   future transportation problems of
                          and operated.                   systems reports, a central financial   the city by formulation of short
                          Challenges in ITS               settlement, a settlement house,   term, medium term and long-term
                          Implementation                  etc. UTIITSL’s role was to design,   transport strategies.
                                                          procure,  develop,  install,  operate
                            Several public transport agencies   and maintain the project.  Going forward
                          have implemented ITS technology   Serious issues started emerging   Pan-city initiatives should explore
                          at different scales with varying   early after ETMs were put into
                          degrees of success. These systems   operation, some of which are listed   the potential of leveraging existing
                          focused on isolated deployments of   below:                    ITS applications and integration of
                          several ITS components, thus not                               the same on a common platform.
                          giving the complete benefit of the   •  Poor battery life: The battery   The focus should also be on the
                          technology. Some of the challenges   of the ETM did not last for more   creation of a consistent database
                          of ITS implementation include:    than 4-5 hours. To rectify the   at the city level that can serve as a
                                                            issue, UTIITSL provided battery   basis for decision making in urban
                          •  lack of resources for operation   back-up, which needed to be
                             and maintenance of ITS         connected and attached to    transport infrastructure planning
                             technology                                                  (mobility planning for goods
                                                            the ETM, adding considerable   and passenger, public transport
                          •  lack of in-house technical     weight to the machine (>800   planning, capturing socio-economic
                             capacity to process, understand   gms). This made it cumbersome   parameters, understanding the
                             and analyse the data           to handle and operate by the   activities of the people, aid in revenue
                          •  lack of advanced analytic      conductor.                   generation, reduce congestion,
                             solutions in the public transport   •  Additional workload: This   reduce travel uncertainty, reduce
                             industry                       led to  80,000-90,000  paper   energy consumption and emissions,
                          •  lack of knowledge on ITS systems   tickets being issued daily, which   ensure safety etc.).The data
                             and capabilities to specify    was nearly 70-75% of the total   feeds from different applications
                             suitable terms when contracting   ridership. This  created extra   will aid in understanding travel
                             ITS services to vendors        work for the agency, to manage   patterns, and determining the
                          •  lack of knowledge among        two systems – paper tickets and   effectiveness of different initiatives
                             vendors on the specific needs   the ETM-issued tickets.     like traffic demand management,
                             of public transport operations,   •  Non-Functional ETMs: 150   infrastructure  performance
                             which  significantly  affects  the   out of the 221 machines were   and foreseeing complex urban
                             utility of the product         non-functional and could not be   challenges.
                          •  lack of understanding about    used, requiring additional paper   Implementation of an integrated
                             the implications of procuring   tickets to be issued.       ITS system in India has many
                             a certain technology in a fast-  •  Revenue Leakage: The use of   challenges but it nevertheless has
                             changing ecosystem             paper ticket posed a problem of   the potential of not only being a
                          •  awarding of ITS contracts purely   potential revenue leakage.  data repository for the city, but also
                             based on the lowest costing   These issues led to a complete   acting as a platform where analysis
                             proposals rather through a   failure of ITS technology. Finally,   and computation can take place to
                             quality and cost-based criteria  JCTSL withdrew ETMs from 17   identify solutions for complex urban
                            The Jaipur City Transport Services   of  a  totals  of  18  routes.  Today,   transport systems.




              www.trafficinfratech-com-500653.hostingersite.com                                                              June-July ’19 / TrafficInfraTech  39
   34   35   36   37   38   39   40   41   42   43   44