INFRASTRUCTURE







































                aprons, for aircraft parking      on to the expressway after the   do not read English due to the
                usage. Design had to consider     runway stretch ended.            nature of the location, which is
                that civilian activities on airstrip   No elevated structure could   primarily rural.
                would stop completely at times    be constructed in and around       The roadway to runway
                of adversity and they would be    the designated stretch. The      operational switch had to be
                guided to a safe parallel route,   expressway main carriageway     achieved within a few hours’
                called diversion road.
                                                  traffic signage had to be simple   notice according to the SOP
                  This specific requirement was   to decipher for high-speed traffic.   as required by the IAF. That
                ensured by designing appropriate   Such signages were not available   meant clearing vehicles off of
                exit ramps from the expressway    in standard signages codes       the runway stretch, dismantling
                main carriageway to the specific   of India and those had to be    of all permanent traffic
                diversion road before start of the   designed for the very first time.   control device, clearing of all
                runway stretch and entry ramp     Traffic signs had to be suitable   foreign object debris (FOD)
                from the diversion road back      for motorists many of whom       and installation of device for


























                                                                             www.trafficinfratech.com / June 2025 / TRAFFICINFRATECH  27