Page 10 - TT June issue pdf for digital
P. 10

UPDATE




          PMRDA’s road network               Kochi’s tram transport system
          project                               he Kochi Metro Rail Limited   experience in operating tram

             n ambitious road network           (KMRL) plans to approve      systems, including in Brisbane,
             project to link key highways    Tthe launch of the new          Australia. The trams are expected
          Aand decongest Pune’s major        transport mode, a light tram, as   to be 25 meters long with three
          traffic corridors was announced    a complement to the existing    coaches capable of carrying up to
          by the Pune Metropolitan Region    metro network. The proposed light   240 passengers. The vehicles will
          Development Authority (PMRDA)      tram will serve areas not currently   use electric-hybrid technology,
          recently. The network would offer   covered by the metro, helping   offering a range of up to 45 km
          direct connectivity between Satara   bridge critical connectivity gaps   on a six-minute charge. Their
          and Ahilyanagar Roads and the      within the city.                low-floor design will ensure easy
          Solapur, Nashik and the Pune-        A primary driver behind the   boarding for all passengers,
          Mumbai highway while improving                                     including those with mobility
          road access to peripheral villages   light tram proposal is its lower   challenges. The trams are also
          and emerging townships. The        cost compared to conventional   designed to run on existing
          project aims to have proper roads   metro systems. KMRL has        roads, elevated structures, or
          connecting to all highways in the   enlisted the expertise of HESS   even underground, allowing
          district and their repairs would be   Green Mobility, a Switzerland-  flexibility based on the city’s
          undertaken in a phased manner.     based company with global       urban layout.
          Once completed, the network is
          expected to cut travel time for daily
          commuters and heavy vehicles       Four-Lane highway corridor in AP
          entering and exiting Pune.
                                                he Cabinet Committee on      Operate-Transfer model and is
                                                Economic Affairs, chaired    expected to enhance connectivity
                                             Tby Prime Minister Narendra     by linking important nodes
          Annual FASTag pass                 Modi recently has approved the   across three major industrial
                                             construction of a 108.134 km,
                                                                             corridors: the Visakhapatnam-
           n a bid to enhance convenience    four-lane Badvel-Nellore highway   Chennai Industrial Corridor, the
           in traveling across national      corridor in Andhra Pradesh.     Hyderabad-Bengaluru Industrial
          Ihighways, the Road Ministry is    The project will be developed   Corridor , and the Chennai-
          introduced a FASTag-based annual   under the Design-Build-Finance-  Bengaluru Industrial Corridor.
          pass priced at `3,000 with effect
          from August 15 this year. The
          pass will be valid for one year    40 road projects in Rajasthan
          from the date of activation or        nder the Central Road        more district road. The projects will
          up to 200 journeys, whichever is      Infrastructure Fund (CRIF),   address existing road conditions
          earlier.
                                             Uthe Central Government         by upgrading key routes that serve
            Under this, the private vehicle   has sanctioned projects covering   both passenger and freight traffic.
          owners will have the option to     almost 1,000 kilometers of road   The focus will be on road surface
          purchase an annual pass granting   length across the state.The projects   strengthening, widening of existing
          them unlimited travel without the   include 31 major district roads,   lanes, and other improvements to
          need for recurring toll deductions.   eight state highways, and one   ensure durability and safety.
          The dedicated link for the activation
          and renewal of the annual FasTag-
          based pass will soon be made       Pune Ring Road Project
          available on both the Highway          SRDC has formally           the Ring Road is expected to
          Travel App and the official NHAI       commenced construction      significantly enhance regional
          website.                           Mwork on the ambitious          connectivity and reduce vehicular
                                             Pune Ring Road project which    pressure within the urban limits
                                             has been strategically divided
                                             into seven phases in the eastern   of Pune and Pimpri-Chinchwad.
                                             region and five in the western   The road spans 169 kilometres in
                                             region. Upon completion,        length and 110 metres in width.


     10   TRAFFICINFRATECH / June 2025 / www.trafficinfratech.com
   5   6   7   8   9   10   11   12   13   14   15