           Type of compatible      Power (kW)          Type of vehicle        The availability issue can range
                Charger          Common config)                             from getting a slot for charging,
                                                                            problems  in  connecting  the
             Type 1, Bharat           3.3 kW           2/3/4-Wheeler        charger and initiating the charging
                 AC-001                                                     process to extreme cases where
                                                                            the user reaches the charging spot
             Bharat DC-001            15 kW            2/3/4-Wheeler        only to figure out that guns are not
                                                                            working or are in a bad condition,
                 Type 2               22 kW            2/3/4-Wheeler        considering the cases of public
                                                                            vandalism of un-manned charging
                                                                            stations.
            CHAdeMO, CCS-II         30-120 kW            4-Wheeler
                                                                              Payments for the charging
                                                                            stations are another challenge
           One important factor that is    different sets of CPOs increases,   where they need to have money
          overlooked is the existence of   focusing on other parts of the   in e-wallets of respective CPOs to
          captive uses such as last-mile   country rises, discoverability as   initiate charging. Payments are
          delivery, which makes extensive   an issue becomes less critical.   a relatively low-hanging fruit for
          utilisation of captive charging.   The EV consumers can be broadly   India, which has robust payment
          Additionally, EV fleets have a good   divided  into  commercial  fleet   infrastructure like UPI. A UPI
          adoption rate for 4-wheelers, with   users, individuals driving frequently   implementation uniformly adopted
          captive charging being the most   intra-city and individuals with high   by  major  CPOs,  where  the  user
          common method.                                                    only needs to scan on reaching the
                                           inter-city usage. Then, it is only the   charging station and pay, can, to a
           Most of the electric 2W in the   users with high inter-city usage
          personal category  are  currently   who are likely to face the issues   large extent, address the payment
          charged at home. Additionally,   with discoverability the most.   part of the network-to-network
          over 80% of the charging for     The real challenge for the rest of   interoperability, in which one of
          personal electric four-wheelers   the  users is  the  availability and   the crucial aspects is allowing
          happens at home. Thus, the actual                                 seamless payments across different
          demand for public charging cannot   reliability of charging points.  CPO network for end-customers.
          be fully captured from a need for
          setting up a number of chargers
          per EV from global benchmarks
          of countries with advanced EV
          adoption. However, setting up
          of charging stations at housing
          societies  in  urban  areas  is  going
          to pose a challenge to the home
          behaviour once numbers increase,
          so scaling of public chargers cannot
          be decelerated if EV adoption is to
          be sustained.
          Availability, Payment
          and Challenges:

           One of the initial set of issues
          with users was the discoverability
          of  charging stations,  considering
          users have to check for multiple
          apps. However, as the number
          of charging stations installed by


      36 TrafficInfraTech / February 2024 / www.trafficinfratech.com