Page 29 - TrafficInfraTech Magazine | Linking People Places Progress
P. 29

FOCUS







                   There are AC chargers of higher   know business will follow. They are
                  capacity which reduces the time to   already seeing that in the charging   “We will continue to
                  charge to half. Now come the DC   stations that they are operating.
                  Fast chargers. A typical DC charger   “As far as the EV ecosystem is   expand our charging
                  of 15/20 KW capacity can reduce   concerned, let me share my view   station infrastructure
                  the charge time to 60 mins. Higher   of  how  things  are  going  to  pan
                  capacity chargers are available   out in the next couple of years.   in the country through
                  which can reduce the time even   2018 and 2019 will be spent on   strategic and technological
                  further to 30 mins but the cars on   discussions and standardisation.   collaborations with
                  Indian roads are not yet ready for   We will also see government
                  the same. Charging time also varies   bodies pushing for EV adoption   partners including auto and
                  according to ambient temperature,   both in purchase of vehicles and   charger OEMs.”
                  the state of the battery (e.g. empty   setting up public charging stations.
                  or half full) and the maximum   By that time, the take off in the
                  charging rate of the vehicle.  2W and 3W segment will drive
                   Magenta’s pricing model will be   the  EV  market.  Come  2020,  the
                  by units of energy charged and   EV infrastructure will move into   and NITI Aayog, which include a
                  not dependant on the charger   the private space with more and   pilot project in electric vehicle (EV)
                  type. This makes it a unitary pricing   more companies getting interested   charging infrastructure in New
                  plan. Off course the time taken to   and investing in this space. 2020 is   Delhi.
                  charge the vehicle will be longer   also the time when manufacturers   ABB’s 50kW fast charging
                  in  the  normal/  slow  charging   like Maruti Suzuki will launch their   station can provide a full charge
                  stations.                     EVs and will possibly change the   to an electric vehicle in only
                   “A lot is spoken about electric   market dynamics. By 2020, car   30  minutes.  “ABB’s  50kW  fast
                  cars which probably will be the   manufacturers will be forced by   charging station can provide a full
                  laggard in the EV movement,   market dynamic to offer electric   charge to an electric vehicle in only
                  but  fortunately  or  unfortunately   versions of their top end selling   30 minutes. “We are honoured
                  is the point of most discussions.   vehicles”, Lewis said.   to support Indian Government’s
                  It is the two-wheeler and three-  By 2022 the vehicle buying   thought leadership and drive
                  wheeler segment which is slowly   decisions of potential customers   to systematically transform the
                  but strongly moving towards   will have to consider electric   nation’s transportation base to
                  e-Mobility”, added Lewis. Cities   options. This will also be interesting   electric vehicles. ABB reinforces its
                  like Delhi which have a huge   times when vehicle manufactures   commitment to the nation’s future
                  population of e-rickshaws and no   will be competing with their   of renewable power generation
                  one even noticed. While these   electric vehicles. By 2025, the   and clean electric transportation
                  e-rickshaws are already on the   vehicle purchase decision will truly   with our global technologies made
                  Indian roads, they are using Indian   be favoured towards electric and   in India, stated Sanjeev Sharma,
                  jugaad for the charging which is a   fossil fuel options which be an
                  safety hazard and not economic.   option not the default.    Managing Director of ABB India in
                  Magenta is soon launching their   Demonstrating its commitment   a company announcement. “We
                  two-wheeler Bike Port and three-  to clean energy and sustainable
                  wheeler charging port under the   transportation,  the  Indian
                  ChargeIn brand, which will address   government’s premier policy think-
                  some of the issues they have seen   tank, NITI Aayog recently installed
                  with the charging of these vehicles.  an ABB Terra 53 fast charging
                   Car manufacturers are waiting   station for electric vehicles at the
                  for charging infra and vice versa.   organization’s office in the New
                  The grid lock must be broken and   Delhi.
                  that is exactly what Magenta Power   The installation by ABB supports
                  has been doing. They are investing   recent proposals by the Ministry
                  in setting up the infrastructure and   of Highways and Transportation




              www.trafficinfratech-com-500653.hostingersite.com                                                              June-July ’18 / TrafficInfraTech  29
   24   25   26   27   28   29   30   31   32   33   34