Page 51 - Trafficinfratech Magazine Aug - Sept
P. 51

FOCUS






                                                    traffic situation at  each  junction  and   Out of the   253 ATC (Smart
                                                    will optimize time in synchronization   1200+ junctions,   Controllers) Televent
                                                    for a smooth journey.”              617 signalized   Controllers
                                                                                        junctions have   364 Non-ATC (Fixed Time)
                                                    Benefits                           been considered   Controllers used- ATMS,
                                                                                        for this project.  VTMS, UCON
                                                     The project will help in smart
                                                    signalling, identifying license number
                                                    plates, control over-speeding vehicles         Count   Arms
                                                    & illegal parking, trace stolen vehicles   2 Arm Junction  56  112
                                                    and recovery of penalty. Besides, the   3 Arm Junction  252  756
                                                    system can help adjust signal time slot   4 Arm Junction  266  1064
                                                    based on vehicular traffic on a road and   5 Arm Junction  29  145
                                                    its length.                       6 Arm Junction  9    54
                   Detailing more on the project,    “Smart signalling with multiple
                  Amitabh Gupta, Principal Secretary   parameters include the length of the   7 Arm Junction  5  35
                  (Special),  Home   Department,    road, intersection clearance, peripheral   Total  617  2166
                  Government of Maharashtra says, “The   road drainage and identification of lost
                  Artificial Intelligence system will regularly   time. With the presence of an adaptive   on, Gupta says, “The Maharashtra
                  gather vehicular data and relay it to the   system and vehicle detection at night,   state government has also planned to
                  central command and control centre.   the signal will not be required to be put   implement a standardised e- Challan
                  It will be analysed to enable the police   on flasher mode. Instead, based on the   system across the state for better
                  manage traffic and monitor traffic rule   presence of a vehicle, the signal will   coordination for traffic enforcement.
                  violations better. The ITMS will require   automatically operate considering the   The system will be implemented in six
                  each traffic signal to be replaced with a   presence at all arms,” informs Gupta.   cities-Mumbai, Navi Mumbai, Thane,
                  more compatible traffic signal.”   The system includes  continuous   Pune, Pimpri- Chinchwad and Nagpur.
                                                                                     The entire project is estimated to be at
                   According to Gupta, it will take one   vehicle classification and  counting.   Rs 60Cr over a span of five years. The e-
                  year to implement ITMS. However,   The smart technology-led enforcement   Challan will bring in more transparency
                  ITMS on the Mumbai-Pune Expressway,   is capable of ANPR and license plate   and trust in the challan process,
                  where the emphasis is on reducing   number detection added with image   will ease the process of accessing
                  accidents is expected to be operational   matching. This high-tech system can   offence details and ease the process
                  within six months, as it does not need   detect over speed violation of up to   of payment. The system will help in
                  installation of traffic signals.  150 km per hour. It also has Origin-   tracking each transaction, reducing the
                                                    Destination analysis of vehicles that
                   Gupta further adds, “We have also   will help in better transportation and   transaction time.”
                  made use of Non-Intrusive Traffic   the system will be completely scalable   The vendor for the project is
                  Detection Technology using 4D radar.   for new signals to be added in future.  Telecommunication Consultant India
                  The  signal synchronisation based  on                              Limited. The work has been approved,
                  vehicle speed and number of vehicles   Proposed Solution           work order has been issued and user
                  at a junction corridor. Also, all signals in   Informing more about another project   acceptance testing (UAT) has been
                  a defined corridor will be aware of the   that the state government is working   completed.
                                                                                     What Will it Achieve?

                                                                                       With the number of cars on
                                                                                     Mumbai’s roads rising daily, the Police
                                                                                     department has long realised that the
                                                                                     way ahead is to manage the flow of
                                                                                     traffic as efficiently as possible instead
                                                                                     of manually regulating it. With ITMS,
                                                                                     the Police hope to reduce travel times,
                                                                                     a source of major frustration for those
                                                                                     who drive on Mumbai’s roads.
                                                                                                           Rohan Ambike




              www.trafficinfratech-com-500653.hostingersite.com                                                        August-September ’19 / TrafficInfraTech  51
   46   47   48   49   50   51   52   53   54   55   56