Page 46 - TT mag Sept 2025 Digital Edition
P. 46

PARKING




          Advanced Automation in  Parking Management



          Hyderabad Metro’s MLP Initiative


          Hyderabad Metro Rail Ltd will deliver a novel project aimed at addressing the city’s parking
          woes. The fully automated multi-level parking system is constructed in the heart of Hyderabad at
          Nampally. Built under HMRL’s supervision through a PPP model by the firm Novum, the project uses
          Germany’s advanced PALIS technology for a fully automated puzzle parking system. Constructed
          on 2,000 square yards of HMRL land under a 50-year concession, the complex comprises
          15 floors, including three basements and seven upper floors, making up 10 dedicated parking levels.
          In addition, five floors have been allocated for commercial activities to make this project financially
          viable. It can accommodate 250 cars and 200 two-wheelers. NVS Reddy, Managing Director –
          Hyderabad Metro Rail Limited, responded to questions posed by TrafficInfratech on the innovative
          parking system at Nampally.



          What prompted the development of a   building complexes through   which attracts over 3 million visitors
          high-tech automated parking complex   skywalks for future needs   annually. The facility enhances
          in Nampally?                                                      accessibility for government
                                           Is the MLP part of Hyderabad’s   employees, shoppers and tourists
           Rapid urbanization and rising   multimodal transport strategy?   reinforcing Hyderabad’s multimodal
          vehicle ownership in Hyderabad                                    vision.
          have led to severe traffic        The long-term vision for seamless
          congestion, especially during    travel and commuter centric      What is PALIS technology and why
          peak hours and festive seasons.   facilities prompted the government   was it selected?
          Traditional roadside parking further   to undertake development of
          worsens the traffic flow. To address   an Integrated Automated Multi   PALIS, developed by a German
          this, HMRL initiated a pilot project   Level Parking (MLP) Complex at   firm, is a globally proven automated
          to explore vertical, automated   Nampally in PPP mode and select a   parking system. It provides for
          parking solutions near Metro     private entity M/s Novum Nampally   100% redundancy – which means,
          stations - bridging the last-mile   Parking Private Limited. It supports   even if half the system is shut
          connectivity gap and optimizing   “park and ride” for daily commuters   down, the entire parking system
          limited urban land.              and large events like Numaish,   will work but with lesser efficiency.

          Why was Nampally chosen for this
          Multi-Level Parking (MLP) project?

           Nampally is a dense commercial
          area with limited parking and high
          footfall. It is strategically located
          near Nampally and Gandhi Bhavan
          Metro stations, surrounded by
          markets, hotels, government offices
          and the railway station. The site
          lacked pedestrian infrastructure,
          which HMRL improved alongside
          the MLP. The facility is also planned
          in such a way that the MLP
          complex can be interconnected
          with the railway terminal stations,
          metro stations and other important

           46  SEPTEMBER 2025 • TrafficInfraTech • www.trafficinfratech.com
   41   42   43   44   45   46   47   48   49   50   51